Deutz 1012 Specifikace Strana 112

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 282
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 111
Service Training
Page 4.2
Section 54
09.04
Disconnect the speed control linkage, start the engine and move the injection
pump control lever as far as the stop by hand.
Adjust engine speed or put
the injection pump governor
or engine in order.
Repeat the test.
Connect LP gauge with adapter V to port F of power limiter. Start engine and
read pressure.
Pressure 17,5 - 21 bar.
econnect speed control linkage, release brake and fully depress one accelerator
pedal. CAUTION! Rotating wheels.
Re-apply brake and fully depress one accelerator pedal.
yes no
yes no
See troubleshooting "Hydro-
static travel drive".
noyes
Engine
speed of 2250
+ 50
rpm
is obtained.
B
A
Speed control
cylinder extends fully.
Engine accelerates to
2250
+ 50
rpm.
Zobrazit stránku 111
1 2 ... 107 108 109 110 111 112 113 114 115 116 117 ... 281 282

Komentáře k této Příručce

Žádné komentáře