Deutz 1012 Specifikace Strana 233

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 282
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 232
Service Training
Section 4.9
Page 7
12.05
- Insert new cylinder head seal without additional
sealant (B).
NOTICE: Before installation of the cylinder
head, clean the thread holes in the
engine block.
- In order to keep the cylinder head seal in the
correct position for assembly of the cylinder head,
screw two 1/2 UNF stud bolts into the motor block
(C).
- Lightly oil the cylinder head screw thread and tighten to 110 Nm in accordance with diagram.
- Tighten cylinder head screws in the order shown in the diagram taking account of the length:
Tighten short screws (S) another 150°.
Tighten medium-length screws (M) another 180 °.
Tighten long screws (L) another 210 °.
Zobrazit stránku 232
1 2 ... 228 229 230 231 232 233 234 235 236 237 238 ... 281 282

Komentáře k této Příručce

Žádné komentáře